Thank you @predge for the detailed clarification, and thanks to @ChronoTrigger, @iamChekwube, and the other contributors for raising important questions.
I appreciate the clear separation between the deterministic payment mechanisms covered by this grant and the additional functionality that construction payments would require.
As a Rootstock Ambassador in Japan and someone actively involved in the demolition and construction industry, I would like to share my practical perspective and clarify how I envision the proposed PoC.
1. The real problem: protecting both contractors and clients
In Japan’s construction industry, payment security remains a significant concern.
For example, some construction contracts use a payment structure of 30% upfront, 20% at an intermediate milestone, and 50% upon completion.
Contractors need confidence that funds will be available when agreed work is completed. Clients, meanwhile, need assurance that payments will only be released under clearly defined conditions.
My long-term interest is in exploring whether blockchain-based escrow and milestone payments can reduce these risks for both parties.
2. An important limitation of the current refund mechanism
One issue deserves particular attention.
In construction, a contractor may complete the agreed work, submit photographs and reports, and still face delayed payment because the client does not respond.
Under Predge’s current deterministic job flow, if no verdict is recorded before the deadline, the funds are returned to the buyer.
I understand why this mechanism is appropriate for the current grant scope.
However, applying the same rule directly to construction payments could leave contractors exposed to the very payment risk we are trying to address.
In the future, I believe construction-specific solutions should allow contractual options such as time-limited approval, independent third-party review, or other clearly defined dispute-resolution procedures.
I am not suggesting that these features be added to the current grant. I am highlighting a practical requirement that should be considered before any real-world construction deployment.
3. Keeping the initial PoC within the existing scope
I support starting with the deterministic functionality that Predge has already defined.
For the initial testnet PoC, I would like to explore:
- Document commitments and verifiable hashes.
- Clearly defined submission and evaluation deadlines.
- Deterministic verification conditions.
- Payment settlement and refund behavior.
- The practical limitations of applying these mechanisms to construction workflows.
Human inspection, subjective completion approval, and construction-specific staged-payment logic should remain outside the current grant scope.
The PoC should clearly document what works today and what would require separate future development.
4. A gradual path toward practical adoption
My preferred approach is to develop this in stages.
First, establish a reliable payment-security framework with appropriate human approval where necessary.
Second, explore AI-assisted verification using site photographs, progress reports, and other construction documentation.
Third, automate processes where objective verification is genuinely possible.
I am also developing a demolition management platform in Japan, which could provide a practical environment for exploring future integration.
If the technology proves useful, I would be interested in discussing deeper technical collaboration and potential adoption within Japan’s construction industry.
For the initial PoC, USDRIF is a reasonable starting point. Longer term, Japanese yen settlement options, including possible integration with JPYC, may be worth exploring.
These are future possibilities, not commitments or additional requirements for the current grant.
5. Moving the PoC forward
I am willing to contribute practical construction workflows, example milestone structures, and operational feedback to help make the testnet PoC meaningful.
I suggest evaluating the work in three stages:
- Technical feasibility using Predge’s existing deterministic mechanisms.
- Practical compatibility with Japanese construction workflows.
- Potential future integration with real business operations.
Any mainnet deployment involving real funds should be considered separately, following appropriate security reviews and assessment of regulatory and operational risks.
To help move the discussion toward implementation, I have three questions for @predge:
Q1. What would be a realistic timeline for preparing and starting the initial testnet PoC?
Q2. Which technical components would Predge provide, and what specific workflows, documents, or test scenarios would you like me to prepare?
Q3. How should we document the results so that the PoC clearly demonstrates the existing deterministic functionality without being mistaken for validation of construction-specific payment features or mainnet adoption?
I believe this approach would allow us to explore a genuine industry use case while maintaining the transparency and scope discipline expected by Rootstock Collective.
My objective is not simply to demonstrate blockchain technology, but to explore whether it can eventually solve real payment problems faced by businesses.
Thank you again for the constructive discussion. I look forward to exploring the next steps.
IBUKI | Rootstock Ambassador