Rootstock - Governance at a Glance 26-10-06

Six weeks since the last one, so this is a bigger edition. The short version: two veteran Rootstock protocols went dark, a yield vault talked itself out of existence using nothing but contract reads, and the forum got its first proposal to bet on whether other proposals will finish.


:money_with_wings: Grants Under the Microscope

[0926] Rootstock Builder Hub: a cohosted showcase at LABITCONF 2026 (September 21, 2026)

RootstockLabs asks for $20,000 to run a shared 6x4m Builder Hub at LABITCONF Buenos Aires (October 30 to 31), where 4 to 8 Collective grantees split the stand and walk-ins get airdropped RIF to stake on the spot. The promise: more than 45 new stakers, that remain staked after 90 days, or roughly a 1.5% increase in stRIF holders. Delegates flagged that the Grants guidelines list events and sponsorships as excluded, and $15,000 (75%) releases on approval, before any of the outcomes that justify the grant exist.

:thermometer: Sentiment: Warm. Community members who attend LABITCONF every year are all in; Axia, Curia and others want a published “event-linked acquisition” exception and a rebalanced first tranche before it goes on-chain.


[2609 Grant] Kleros Foresight: Grant Completion Markets for RootstockCollective, Milestone 1 (September 22, 2026)

Kleros proposes a six-month pilot where every grant application gets a conditional prediction market: “if this team is funded, will they complete their grant?”, settled on the terminal milestone payment. Markets trade in USDRIF on a native Seer deployment, Kleros covers liquidity and trading credits, and the total ask is $15,000 across five milestones, with only $1,500 requested up front.

:thermometer: Sentiment: Curious and supportive of Milestone 1. The recurring worry is thin markets; DAOstar wants a hard flag (or a withheld reading) for any market with fewer than 5 traders.


[2608 Grant Proposal] 1delta Intents: permissionless solving on Rootstock (August 2, 2026)

1delta wants to fix USDRIF’s exit problem (about $99k of stablecoin depth against a $2.38M supply when they posted) with an intent layer where anyone can act as a solver, routing through DEXs, RIF on Chain mint and redemption, or CEXs per order. The September 16 revision addressed a month of delegate remarks: Milestone 4 grew to $10,000 (28.6%) and a 12-month impact review, Milestone 2 now needs $10,000+ settled by solvers other than 1delta’s, and mint-side volume floors. Tranche 1 ($3,000, earmarked for the audit deposit) is on-chain, pre-audit approvals are capped around 1,000 USDRIF per user, and two outside solver teams are interested but unnamed.

:thermometer: Sentiment: Probably the most thoroughly sanded-down proposal on the forum right now. Delegates lean yes.


[2609 Grant] Rootstock Yield Vault: immutable ERC-4626 rBTC vault across LayerBank and Sovryn (September 11, 2026)

Solo builder Ivan Ursulović asks for $25,000 ask ($15,000 of it a pass-through to Coinspect for the audit) for an admin-free rBTC vault that splits deposits between LayerBank and Sovryn, capped at 60% per venue. ChronoTrigger remarked that with a forced 60/40 split the vault earns less than just depositing in Sovryn directly. Similar products exist in Reserve for ETH (ETH+) on the basis of diversification of staking risk, and find some takers. On September 27 the author paused his own proposal after finding a 2022 Sovryn loan carrying 3.67 rBTC of principal (13.3% of the pool’s lender claims) backed by SOV worth about 0.17 rBTC, plus a Sovryn DOC pool with 12.38 DOC withdrawable against 622,684 DOC of claims.

:thermometer: Sentiment: Respect. DAOstar called it an exemplar of how the RFC process should work, and it’s hard to argue; a builder citing block numbers to explain why the DAO shouldn’t fund him is a rare sight in any forum.


[2606 Grant] Andromeda Core: Autonomous Reputation Infrastructure, Milestone 1 (June 5, 2026)

The self-funded FES pilot (does a personalized yield report wake up idle RIF holders better than a generic nudge?) is built, technically reviewed, and frozen: 18 wallets split into Group A (9), Group B (8) and one VIP, with the snapshot and Merkle root published to IPFS. The four-week observation window can’t start, because it begins when the pilot link is published in an official Collective channel. Which is still pending since early July. The Spanish-language AMA (originally a Spaces on September 25, cancelled due to internet and power problems in Venezuela, then recorded asynchronously with English subtitles) went up on October 6.

:thermometer: Sentiment: Patient, sympathetic. Delegates are happy with the guardrails (fewer than 8 report views counts as inconclusive, group-level A/B results reported side by side); ChronoTrigger is now openly nudging the Collective team to post the link. LEGOSI’s idea of turning the tool into a prospecting engine for builders got a “very interesting” from SEEDGov and might be the most useful thing to come out of the thread.


:wrench: Collective Rewards and Ecosystem Housekeeping

[2609 Builder Deactivation Proposal] Tropykys (September 7, 2026)

Tropykus completed its wind-down on August 31 and is being removed as an active builder. The shutdown traces back to an April security assessment with Money on Chain: the contracts were largely immutable, so they couldn’t harden them without a full migration and chose an orderly exit instead. More than 99% of user funds went back to their owners, after a lifetime of $27.09M in deposits and $8.82M in loans.

:thermometer: Sentiment: Fond farewell. LEGOSI suggested a “Legacy” tab in the dApp and asked the Collective to keep the post-mortem around as teaching material for new builders.


[2609 Deactivation Proposal]: Collective Rewards for Boltz (September 2, 2026)

Boltz suspended service on August 3 after a run of AI-assisted attacks; it’s non-custodial, so no user funds were at risk, but the losses were heavy enough that the original team stepped back. A group of veteran Bitcoiners is taking the project over and working to bring it back online. The Collective is pausing Boltz’s rewards campaign in the meantime and says it would welcome the integration back later.

:thermometer: Sentiment: Quiet.


:rocket: Product

RC V14.0 Release Note (September 10, 2026)

Builders now show their real logos instead of generated identicons. The Support form now requires a wallet address or transaction hash, prefills your connected wallet, and hands the team a direct explorer link.

:thermometer: Sentiment: Small, welcome polish. Backers can finally tell builders apart.


:telescope: The Big Picture

Immutability is a two sided sword. Tropykus shut down because its contracts couldn’t be changed. In the same time, both 1delta and the Yield Vault pitched “no admin, no pauser, no upgrade path” as their main safety feature, and delegates pushed both on the same question: if something breaks and you can’t patch it, what’s the plan? 1delta answered with a five-step incident playbook and allowance caps. The vault product answered by checking whether the venues underneath it were healthy enough to deserve an immutable router at all - before concluding they weren’t.

The proposals that could make a great difference right now are the ones to improve a specific channel (USDRIF exits, idle RIF, staker onboarding at LABITCONF).

Delegate review has also sometimes turned into on-chain forensics. ChronoTrigger reading the vault repository for missing reward-claim logic, Curia benchmarking LABITCONF sponsor tiers, 1delta’s team publishing per-route quotes from QuoterV2.

Like they say “there are no non-technical people” anymore. Some bottlenecks now sit on the Collective’s desk: Andromeda has been ready and waiting on a channel link for ~ three months, and the Builder Hub needs a guidelines clarification that only the Collective can write.

4 Likes

Thanks for the accurate write-up, Raphael. The governance update, captures the situation correctly: the pilot is built, technically reviewed, frozen, and waiting on channel distribution to start the observation window. We’re coordinating with the Collective team now to get the link live across their official channels, and we’ll share the exact start timestamp here as soon as it goes up.

Appreciate the transparency in the newsletter, it’s a useful public record of where things stand.

2 Likes

Thanks for this detailed governance update!

As a Rootstock Ambassador in Japan, I believe clearer proposal status updates could help more newcomers participate.

A simple summary showing which proposals are active, paused, or awaiting decisions would make governance discussions easier to follow, especially for international community members.

2 Likes

We have a daily roundup of forum activity, that we now publish to our homepage.

You can find it here: Rootstock Collective governance digest | Anode

2 Likes