# RPCDrift: Rootstock RPC Compatibility & Regression Testing

**URL:** <https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011>\
**Category:** Grants & Incentives\
**Created:** [October 26, 2026, 6:19pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011 "2026-10-26T18:19:56Z")\
**Posts on this page:** 17\
**Page:** 1

<div class="post-metadata">

**Author:** ![Carl](https://avatars.discourse-cdn.com/v4/letter/c/ee7513/32.png) [@Carl](https://gov.rootstockcollective.xyz/u/Carl)\
**Post date:** [October 26, 2026, 6:19pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/1 "2026-10-26T18:19:56Z")

</div>

# Project Name & Description

**Project Name:** RPCDrift

**Tagline:** Catch the drift before it breaks your dapp.

**Category:** Developer Tooling & Infrastructure

**Project Description**

RPCDrift is an open-source developer toolkit that helps applications and infrastructure providers identify RPC compatibility issues before they affect production systems on Rootstock.

Wallets, decentralized applications, block explorers, indexers, analytics services, and other blockchain applications depend on predictable JSON-RPC behavior. Changes to transaction receipts, transaction formats, error handling, or other RPC responses can affect downstream integrations even when the application’s own code has not changed.

RPCDrift will provide a command-line interface (CLI), configurable RPC regression tests, compatibility reports, and a reusable GitHub Actions workflow. Developers will be able to execute the same tests against supported Rootstock environments and compare the results to identify unexpected behavior changes.

The initial test profile will investigate high-priority compatibility scenarios associated with the proposed Cardamom upgrade, particularly RPC transaction-receipt behavior, while establishing a reusable framework for future Rootstock releases.

RPCDrift will complement existing Rootstock node and integration testing infrastructure. Its focus will be downstream application-consumer testing, reusable compatibility checks, and CI workflows that individual development teams can integrate into their release process.

## 1. Team Background

### Project Lead

- **Name:** Carl

- **Role:** Product direction, requirements, developer outreach, pilot coordination, documentation, and grant reporting.

- **GitHub:** [duongja (Mad G) · GitHub](https://github.com/duongja)

- **Relevant experience:** ENSCLI: A TypeScript command-line tool for resolving, inspecting and debugging Ethereum Name Service (ENS) names. It includes diagnostic commands, CCIP Read tracing, JSON output, and a declarative configuration workflow. This is especially relevant to RPCDrift’s proposed CLI and developer experience.

- VeilSafe: A reference implementation exploring privacy-preserving multisig ownership using zero-knowledge proofs, Solidity and Noir. Its documented local workflow includes deployment, proof generation, and Safe transaction execution. This demonstrates exposure to smart-contract architecture and blockchain development.

- COOLTOKEN: A public project exploring an ERC-20 token implementation using Rust and Arbitrum Stylus. This is relevant to EVM-compatible blockchain development, though the public repository alone does not establish production deployment or adoption.

- Compound Finance documentation PR #109: A publicly visible pull request proposing `llms.txt` and Markdown documentation mirrors for LLM and agent consumption. It is relevant to developer documentation and open-source collaboration. The pull request is marked open, so we should not describe it as a merged contribution.

### Technical Lead

- **Name:** Kitsune

- **Role:** Software architecture, TypeScript development, Rootstock RPC integration, automated testing, and CI/CD implementation.

- **GitHub:** [0xKitsune · GitHub](https://github.com/0xKitsune)

- **Relevant experience:** Kitsune’s public GitHub work demonstrates experience with EVM developer tooling, smart-contract analysis, and testing workflows.

### Additional Contributors

- **Name ; Zynnor**

- **GitHub;** [zynorr (zynor) · GitHub](https://github.com/zynorr)

## 2. Total Grant Amount

**Total grant requested: $8,500 USD equivalent.**

The denomination, payment asset, and conversion terms will be confirmed with RootstockCollective before submission.

**Milestone 1 request: $2,125, representing 25% of the proposed grant total.**

The proposed allocation is:

| Milestone | Amount | Share |
| --- | --- | --- |
| Milestone 1: Specification and initial prototype | $2,125 | 25% |
| Milestone 2: Expanded test suite and CI integration | $3,825 | 45% |
| Milestone 3: Pilot release and impact measurement | $2,550 | 30% |
| **Total** | **$8,500** | **100%** |

The initial on-chain proposal will request only the approved Milestone 1 tranche. Later funding will be requested through the required milestone-review process after the relevant deliverables have been completed and verified.

The final payment schedule will follow the Collective’s applicable terms, including any post-completion impact-review requirements.

### Indicative budget breakdown

**Milestone 1: $2,125**

- Existing-tool review and technical specification: $350

- CLI foundation and RPC client: $1,050

- Initial compatibility tests: $400

- Test infrastructure: $125

- Documentation and prototype demonstration: $200

**Milestone 2: $3,825**

- Expanded regression test suite: $1,700

- Baseline comparison and reporting: $850

- GitHub Actions integration: $550

- Integration testing and QA: $475

- Documentation and examples: $250

**Milestone 3: $2,550**

- External pilot support and testing: $750

- Stable release and packaging hardening: $500

- Documentation and maintenance guide: $350

- Pilot feedback and issue resolution: $400

- Impact metrics and final reporting: $350

- Infrastructure and release support: $200

## 3. Milestone 1 Deliverables

### Milestone 1: Technical Specification and Working CLI Prototype

**Target duration:** Weeks 1–3 after the approved project start.

The objective of Milestone 1 is to establish a clearly differentiated, usable prototype that can execute a first set of RPC compatibility checks against Rootstock environments.

### Deliverable 1: Requirements and Existing-Tool Analysis

Review Rootstock’s published RPC documentation, the Cardamom proposal, and the existing Rootstock integration-test repository.

Define which scenarios are already covered by existing infrastructure and which downstream application compatibility checks merit a separate, reusable tool.

**KPIs:**

- One published technical specification.

- One documented competitive and duplication analysis.

- At least five developer interviews targeted.

- At least two prospective pilot users or integration commitments sought and documented.

- A public issue tracker and initial development roadmap.

### Deliverable 2: Initial RPCDrift CLI

Implement the initial TypeScript-based CLI, configuration handling, RPC client, and a starter collection of deterministic compatibility tests.

The first checks will focus on RPC connectivity, chain identification, block queries, transaction lookup, transaction receipt retrieval, and validation of response structures.

Tests for proposed Cardamom-specific behavior will be clearly marked as provisional until the applicable specifications and release behavior are confirmed.

**KPIs:**

- At least 10 documented, reproducible automated test cases.

- Successful execution against a documented Rootstock development or test environment.

- Read-only compatibility checks demonstrated against a supported Rootstock mainnet endpoint.

- A clear pass/fail output for every implemented check.

- Installation instructions and sample configuration published in the repository.

### Deliverable 3: Reproducible Prototype Demonstration

Demonstrate a developer running RPCDrift against a configured environment and receiving a structured compatibility report.

**KPIs:**

- One recorded working demonstration.

- One sample JSON or Markdown compatibility report.

- One documented procedure for reproducing the results.

- Basic automated tests for the CLI and test runner.

**Milestone 1 acceptance criteria:** A reviewer can access the source repository, install the prototype, execute the initial tests in a documented environment, and inspect the results.

## 4. Milestones 2 & 3

### Milestone 2: Expanded Regression Suite and CI Integration

**Target duration:** Weeks 4–6.

The objective is to turn the CLI prototype into a reusable developer workflow that projects can adopt in their existing release pipelines.

#### Deliverables

1. Expand the RPC compatibility suite across the confirmed behavior categories.

2. Implement configurable expected-result checks and comparison against documented baselines.

3. Produce human-readable and machine-readable reports.

4. Provide a reusable GitHub Actions workflow.

5. Publish example integrations and developer documentation.

The tests will investigate relevant RPC behavior, including transaction and receipt responses, supported transaction formats, gas estimation, error handling, and other upgrade-related behaviors where the finalized specification makes them applicable.

**KPIs:**

- At least 25 documented automated test cases.

- Coverage of at least five defined RPC behavior categories.

- A working GitHub Actions example.

- Reproducible results across at least two documented environment configurations, where supported.

- Clear reporting of failed checks and unexpected response differences.

- Published setup, configuration, and troubleshooting documentation.

**Acceptance criteria:** An independent developer can configure RPCDrift, run the compatibility checks, and obtain a report locally or through a documented CI workflow.

### Milestone 3: Pilot Adoption, Stable Release and Impact Review

**Target duration:** Weeks 7–9, followed by the required post-completion impact-review period.

#### Deliverables

1. Publish a versioned release of RPCDrift.

2. Complete pilot integrations with downstream Rootstock developers.

3. Resolve critical issues found during testing.

4. Publish comprehensive documentation, contribution guidance, and a maintenance plan.

5. Produce a report containing verifiable adoption and quality metrics.

**KPIs:**

- At least three external pilot integrations targeted.

- At least 50 recorded CI test runs across participating pilots targeted.

- At least one public example repository demonstrating integration.

- A documented account of compatibility issues found and resolved.

- Public release notes, contribution guidance, and issue tracker.

- A post-completion impact report covering continued use, repeat test execution, developer feedback, and remaining limitations.

All targets represent proposed objectives, not current usage or achieved results. Final targets will be adjusted to reflect validated demand, pilot access, and the technical capabilities confirmed during Milestone 1.

The impact review will focus on the project’s usefulness to Rootstock developers rather than manufacturing transactions or reporting unrelated on-chain activity.

## 5. Timeline

**Proposed development period: Nine weeks after project commencement.**

| Period | Workstream | Expected output |
| --- | --- | --- |
| Weeks 1–3 | Requirements, repository review, CLI prototype | Technical specification and at least 10 tests |
| Weeks 4–6 | Expanded regression suite and CI | At least 25 tests and automated reports |
| Weeks 7–9 | Pilot integrations and stable release | Public release, pilot results and documentation |
| Post-completion | Continued-use measurement | Final impact report |

The schedule will begin only after formal grant approval and project commencement.

Cardamom’s proposal and release schedule may change. RPCDrift will therefore use confirmed specifications for its initial upgrade-related test profile and retain a reusable architecture that can support subsequent Rootstock releases.

## 6. Technical Specs

### Technology Stack

- **Language:** TypeScript.

- **Runtime:** A supported Node.js LTS release.

- **RPC client:** A suitable EVM client library, subject to compatibility testing.

- **Test runner:** A TypeScript-compatible automated test framework.

- **CI/CD:** GitHub Actions.

- **Reporting:** JSON and Markdown reports.

- **Source management:** Public Git repository with versioned releases.

The final package and repository names will be confirmed before publication.

### Architecture

**1. Configuration Layer**

Reads configured Rootstock RPC endpoints, validates network settings, and loads the selected test profile.

**2. RPC Execution Layer**

Sends JSON-RPC requests to the configured node and records normalized outcomes, errors, response times, and relevant response fields.

**3. Compatibility Test Engine**

Executes modular test cases against expected behavior. Stable checks and provisional upgrade-specific checks will remain distinguishable.

**4. Baseline Comparison Engine**

Compares results from configured environments or saved reference outputs. Reports will distinguish potential incompatibilities from expected differences caused by network state or timing.

**5. Reporting and CI Layer**

Produces structured reports and a non-zero CI exit status for configured failures. Developers can use the results to investigate changes before merging or releasing their applications.

### Initial Test Scenarios

The initial suite will investigate:

- RPC connectivity and chain identification.

- Block and transaction lookup.

- Transaction receipt shape and relevant field semantics.

- Gas-estimation responses and error handling.

- Compatibility with supported transaction formats.

- Differences between documented baselines and configured environments.

- Additional Cardamom-related behaviors where the final specifications and environment support them.

Cardamom-specific cases will be based on confirmed release specifications rather than assumptions that all proposed RSKIPs will be adopted.

### Security and Operational Boundaries

RPCDrift will default to read-only operations against mainnet.

Any tests requiring state changes or transaction submission will use controlled test environments and test-only accounts. The tool will not collect or store users’ private keys, custody funds, or modify live contracts.

RPCDrift will report the results of its defined compatibility tests; it will not claim to prove full consensus correctness, guarantee application security, or replace an independent security audit.

### Existing-Tool Differentiation

Rootstock maintains an open-source integration-test repository that covers core network and bridge testing.

RPCDrift will not replicate that suite. Its proposed differentiation is reusable **downstream consumer contract testing** : configurable checks for the RPC behavior relied on by independent applications, saved-result comparison, actionable reports, and a CI workflow that teams can integrate into their repositories.

Milestone 1 will verify this distinction and narrow the implementation if existing tools already cover some of the proposed features.

## 7. Value Proposition for Rootstock

RPCDrift aims to make Rootstock application integrations more reliable by providing developers with a consistent way to test their RPC dependencies before and after network changes.

### Developer Reliability

Repeatable compatibility tests can help detect integration failures earlier in the release cycle and reduce the need for each project to build its own isolated testing scripts.

### Network Upgrade Readiness

A reusable test profile gives downstream developers a common workflow for preparing for upgrades and validating their applications against documented Rootstock behavior.

### Open-Source Ecosystem Value

The CLI, test cases, CI workflows, and documentation will be openly available for reuse and contributions by independent developers.

### Measurable Adoption

The project will track:

- Number of independent repositories integrating RPCDrift.

- Number of successful and failed automated test runs.

- Repeat use across releases.

- Documented compatibility issues found.

- Developer feedback and contributions.

- Time required to execute the compatibility checks compared with the pilot baseline.

For this developer-tooling project, verifiable tool usage and integration metrics are the primary adoption measures. We will not claim direct increases in TVL, transaction volume, or active wallets unless evidence demonstrates that RPCDrift contributes to those outcomes.

### Long-Term Sustainability

RPCDrift will support community contributions, versioned test profiles, and maintenance updates based on confirmed Rootstock changes. Its modular architecture will make it possible to add new compatibility cases without rebuilding the entire tool for every network upgrade.

##

---

<div class="post-metadata">

**Author:** ![Seviramar](https://yyz2.discourse-cdn.com/flex030/user_avatar/gov.rootstockcollective.xyz/seviramar/32/37_2.png) [@Seviramar](https://gov.rootstockcollective.xyz/u/Seviramar)\
**Post date:** [October 27, 2026, 7:32pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/2 "2026-10-27T19:32:22Z")

</div>

Thanks for sharing the proposal. RPCDrift addresses an interesting problem, particularly around helping Rootstock developers identify RPC compatibility issues before they affect production applications.

I have a few questions and points I’d like to better understand:

**1. Differentiation and existing infrastructure**

The proposal mentions Rootstock’s existing integration-test repository and positions RPCDrift as a complementary tool focused on downstream applications. Could you provide a concrete example of a compatibility issue that RPCDrift would detect but the existing testing infrastructure would not? Understanding this distinction would help clarify the project’s added value.

**2. Demand and potential adoption**

Have any Rootstock developers or infrastructure providers expressed interest in using this tool, or reported issues that it could have prevented? The proposal targets at least three external pilot integrations in Milestone 3. Do you already have potential pilot users in mind, or would identifying and onboarding them be part of the project?

**3. Cardamom and long-term relevance**

How much of the initial development depends on the proposed Cardamom upgrade? If the relevant RPC changes are limited, delayed, or already covered by existing tools, how would the project adapt to ensure RPCDrift remains useful for future Rootstock upgrades?

**4. Budget and scope**

The requested $8,500 is divided across three milestones, with $2,125 requested for the initial milestone. Could you provide an estimate of the development effort involved in each milestone and clarify which deliverables would be considered essential for the first usable release?

**5. Maintenance and sustainability**

After the grant is completed, who would be responsible for maintaining the test profiles as Rootstock evolves, addressing issues, and reviewing community contributions? Is there a plan to encourage adoption and ensure the tool remains useful beyond the initial release?

Overall, I’d be interested in understanding the concrete demand for RPCDrift and how its impact will be demonstrated in practice. In particular, evidence that it can identify compatibility issues affecting real applications, together with early interest from potential users, would help assess its value to the Rootstock ecosystem.

---

<div class="post-metadata">

**Author:** ![Carl](https://avatars.discourse-cdn.com/v4/letter/c/ee7513/32.png) [@Carl](https://gov.rootstockcollective.xyz/u/Carl)\
**Post date:** [October 28, 2026, 12:56am UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/3 "2026-10-28T00:56:00Z")

</div>

Hi,

Thank you for the thoughtful feedback. We agree that RPCDrift must demonstrate clear differentiation, credible demand, and measurable impact. We’ve refined our approach as follows.

**1. Differentiation and Existing Infrastructure**

RPCDrift is not intended to replace Rootstock’s core integration-test suite. Our focus is downstream application compatibility: verifying that external applications and their RPC clients continue to parse and consume Rootstock responses correctly as network behavior evolves.

For example, an application may rely on `eth_getTransactionReceipt` and assume particular transaction types, status fields, or log encodings. A change in receipt behavior could cause an explorer, indexer, or SDK integration to fail even when the node itself passes its core tests.

RPCDrift would provide consumer-focused test cases that exercise these responses, validate application-level expectations, compare results against a documented baseline, and generate a reproducible report. Cardamom provides a relevant initial use case because Rootstock’s announcement specifically highlights potential RPC receipt changes.

We recognize that existing tests may already cover individual aspects of this behavior. Our first milestone will review the existing suites and identify the specific consumer-level checks that remain uncovered. We will reuse or integrate existing tests where appropriate rather than duplicate them.

**2. Demand and Potential Adoption**

We are exploring a potential partnership with a Kenyan fintech startup launched in 2026. These discussions are preliminary, and we do not yet have a confirmed RPCDrift pilot or a commitment from a Rootstock integrator.

Our immediate next step is to establish whether the startup uses or plans to use Rootstock, identify its RPC dependencies, and determine whether our proposed tests address a real integration need.

During Milestone 1, we will conduct at least five developer interviews and seek documented interest from prospective pilot users. Our target remains three external pilot integrations by Milestone 3, but these are goals rather than confirmed commitments.

If the initial conversations reveal that the proposed problem is not sufficiently relevant to Rootstock applications, we will adjust the scope based on feedback from actual developers.

**3. Cardamom and Long-Term Relevance**

Cardamom is an initial validation opportunity, not a dependency for the entire project. We will use its proposed RPC changes to define candidate regression tests, subject to verification against finalized specifications.

If Cardamom is delayed or its relevant changes are modified, RPCDrift will continue to support versioned regression profiles for stable RPC behavior and future Rootstock upgrades. The test cases will be configurable so new scenarios can be added as the network evolves.

Our objective is a reusable downstream testing tool rather than a one-off Cardamom compatibility patch.

**4. Budget, Scope and First Usable Release**

The total request remains $8,500, with $2,125 requested for Milestone 1. We estimate approximately 225 combined person-hours across the three milestones.

- **Milestone 1 — $2,125; approximately 55 hours over Weeks 1–3:** Review existing test coverage, publish the technical specification, and deliver an initial CLI, a receipt-focused consumer compatibility test, a reproducible fixture, and a structured report. This is the essential first usable release.

- **Milestone 2 — $3,825; approximately 100 hours over Weeks 4–6:** Expand the verified test suite, implement baseline comparisons and GitHub Actions integration, and add actionable failure reports and reliability controls.

- **Milestone 3 — $2,550; approximately 70 hours over Weeks 7–9:** Complete pilot testing, resolve critical issues, publish a versioned release, and document adoption, test results and limitations.

The effort estimates are planning figures and will be refined after Milestone 1 confirms the technical scope. The first milestone deliberately limits implementation until we have established that the proposed functionality adds value beyond existing infrastructure.

**5. Maintenance and Sustainability**

We intend to maintain RPCDrift as an open-source project for at least 12 months following its initial release.

Carl will coordinate documentation, issue triage, community feedback and release communication. Kitsune will oversee the regression-test architecture and technical maintenance, while Zynorr will support integration adapters, testing and CI examples.

The repository will include versioned test profiles, automated checks, contribution guidelines and documented limitations. We will encourage adoption through public examples, developer outreach and feedback from pilot integrations. Maintenance priorities will follow confirmed Rootstock changes and actual community use rather than Cardamom alone.

**6. Measuring Impact**

We will report verifiable outcomes rather than relying on downloads or general adoption claims alone. Our proposed measures include:

- Compatibility issues identified and reproduced through the test suite.

- Independent repositories integrating RPCDrift.

- Successful and failed automated test runs.

- Repeat use across releases.

- External pilot feedback and documented improvements.

We will distinguish issues detected by RPCDrift from issues already caught by existing tools and will not claim that the project prevents failures unless there is evidence supporting that conclusion.

Best regards,  
Carl  
Project Lead, RPCDrift

---

<div class="post-metadata">

**Author:** ![Seviramar](https://yyz2.discourse-cdn.com/flex030/user_avatar/gov.rootstockcollective.xyz/seviramar/32/37_2.png) [@Seviramar](https://gov.rootstockcollective.xyz/u/Seviramar)\
**Post date:** [October 28, 2026, 11:34am UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/4 "2026-10-28T11:34:23Z")

</div>

Thanks for the detailed response. This clarifies the scope and the intended differentiation from existing infrastructure, particularly the focus on downstream application compatibility.

One point I’d emphasize is the importance of making Milestone 1 a decision point, not just a technical deliverable.

Since there are no confirmed pilot integrations yet, would you consider making the continuation to Milestone 2 contingent on demonstrating both a concrete gap in existing testing infrastructure and evidence of demand from potential Rootstock integrators?

I’d also be interested in understanding what would happen if the initial research finds that existing tools already cover most of the proposed scenarios, or that developers do not consider this a significant problem. In that case, would the team narrow the scope, revise the approach, or stop before requesting the next tranche?

Finally, regarding the 12-month maintenance commitment, could you clarify what level of maintenance you expect to provide during that period, particularly as Rootstock evolves?

I think these points would help establish clear expectations for milestone reviews and ensure that subsequent funding is supported by demonstrated value for the ecosystem.

---

<div class="post-metadata">

**Author:** ![Carl](https://avatars.discourse-cdn.com/v4/letter/c/ee7513/32.png) [@Carl](https://gov.rootstockcollective.xyz/u/Carl)\
**Post date:** [October 28, 2026, 3:05pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/5 "2026-10-28T15:05:03Z")

</div>

Hi,

Thank you for the thoughtful feedback. We agree that Milestone 1 should be a decision point based on evidence, rather than simply the completion of technical work.

We are prepared to structure RPCDrift around the following approach:

**1. Milestone 1: Validate the gap and demand**

Before proceeding to Milestone 2, we will:

- Conduct a source-level audit of Rootstock’s existing integration tests and related tooling to map the scenarios already covered and identify any meaningful gaps relevant to downstream application developers.

- Build a small, reproducible proof of concept to demonstrate whether a proposed compatibility issue can be detected and clearly reported. Where we use controlled fault injection, we will explicitly distinguish simulated failures from confirmed issues in Rootstock infrastructure.

- Conduct at least three structured conversations with potential Rootstock integrators or developers to understand their current testing workflows, existing pain points, and willingness to evaluate or pilot the proposed tool.

We will document the findings and use them to determine whether the project should proceed.

**2. Decision criteria for Milestone 2**

We will recommend proceeding only if Milestone 1 demonstrates a meaningful downstream compatibility-testing gap that existing tools or workflows do not adequately address, a reproducible way to detect or explain that gap, and credible evidence of developer demand.

If existing tools already cover most of the proposed scenarios, we will narrow or revise the scope around a specific, evidence-backed unmet need. If the research finds neither a meaningful gap nor sufficient demand, we will stop after Milestone 1, submit the findings and deliverables, and not request the next tranche. Any unspent funds will be handled in accordance with the grant terms.

**3. Twelve-month maintenance commitment**

For twelve months following the initial stable release, we intend to provide bounded maintenance for the supported functionality. This includes reviewing relevant Rootstock RPC and node changes, updating compatibility profiles and test fixtures where necessary, maintaining the CI workflow, addressing reproducible bugs within our capacity, applying reasonable dependency and security updates, and documenting releases and known limitations.

This commitment does not imply a 24/7 support SLA or immediate compatibility with every third-party RPC provider. We will document the maintenance scope and identify a responsible team member so expectations remain clear.

We believe this structure makes the proposal more accountable by ensuring that further development and funding depend on demonstrated technical value and evidence of demand, rather than assumptions about the problem.

Best regards,  
The RPCDrift Team

---

<div class="post-metadata">

**Author:** ![Mattsanto](https://yyz2.discourse-cdn.com/flex030/user_avatar/gov.rootstockcollective.xyz/mattsanto/32/346_2.png) [@Mattsanto](https://gov.rootstockcollective.xyz/u/Mattsanto)\
**Post date:** [October 28, 2026, 8:53pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/6 "2026-10-28T20:53:13Z")

</div>

Thanks for the detailed reply to @Seviramar , @Carl . While the 12-month maintenance commitment is positive, **I have concerns about both the cost estimate and the lack of validated demand on Rootstock before funding:**

1. **Rate & Hours Adjustment ($30/hr given AI-assisted workflows):** You estimate 225 hours for $8,500 (~$37.70/hr). Given how much AI coding tools have lowered development time and costs—especially for TypeScript CLIs, test templates, GitHub Actions, and documentation—both the hourly rate and the 225-hour estimate feel high compared to current market rates for strong talent. Adjusting the rate to **$30/hr** (bringing the total grant to **$6,750** across the milestones, or reducing the billed hours accordingly) would be much more competitive. Would the team be open to this budget adjustment?

2. **Zero outreach to existing Rootstock projects before Milestone 1:** In your reply, you mentioned your only preliminary contact is a Kenyan startup where you still need to _“establish whether the startup uses or plans to use Rootstock.”_ At the same time, you ask for Milestone 1 funding to interview 5 developers and note that _“if the initial conversations reveal that the proposed problem is not sufficiently relevant to Rootstock applications, we will adjust the scope.”_ Talking to 3–5 active Rootstock teams should happen **before** approving the grant, not paid for by Milestone 1 just to see if the problem exists.

3. **Hardening Milestone 2 & 3 conditions:** You reiterated that the 3 pilot integrations in Milestone 3 _“are goals rather than confirmed commitments.”_ If Milestone 1 goes through, what is the exact go/no-go condition to unlock Milestone 2? Would you agree to pause the grant after M1 if at least **2 active Rootstock projects** don’t formally commit to using the tool, and make the **3 pilot integrations a fixed requirement** for M3?

---

<div class="post-metadata">

**Author:** ![Carl](https://avatars.discourse-cdn.com/v4/letter/c/ee7513/32.png) [@Carl](https://gov.rootstockcollective.xyz/u/Carl)\
**Post date:** [October 29, 2026, 1:17pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/7 "2026-10-29T13:17:04Z")

</div>

Hello Mattsanto,

Thank you for the thoughtful feedback. We agree that RPCDrift should demonstrate a concrete, validated need within the Rootstock ecosystem before proceeding with the full implementation. We have reviewed your recommendations and are prepared to adjust both the budget and milestone structure accordingly.

**1. Revised budget**

We accept the recommended rate of $30/hour, reducing the maximum grant request from $8,500 to **$6,750 for up to 225 hours**. We will use AI-assisted development where appropriate and treat the hours as a ceiling rather than a guaranteed expenditure. Only work actually performed will be billed, with progress and deliverables documented against each milestone.

**2. Pre-grant demand validation**

Before proceeding with implementation, we will contact five active Rootstock ecosystem teams, aiming to complete at least three substantive conversations. These discussions will help us understand how teams currently test RPC compatibility, what existing infrastructure already covers, and whether a distinct downstream testing gap exists.

Our target is to secure written expressions of interest from at least two active Rootstock projects willing to evaluate RPCDrift. We will distinguish genuine pilot commitments from general interest and will not present prospective partnerships as confirmed integrations.

Regarding the two Kenyan startups mentioned in our proposal, we are currently in discussions with them about potential partnerships. These relationships are part of our broader ecosystem engagement, but we recognize that they do not, by themselves, establish Rootstock-specific demand. We will validate that demand directly with teams actively building on Rootstock.

**3. Milestone 1 as a decision gate**

We agree that Milestone 1 should determine whether the project merits further investment, rather than simply deliver a technical artifact.

Milestone 1 will therefore focus on:

- A source-level audit of existing Rootstock testing infrastructure and relevant RPC behavior.

- A documented coverage matrix identifying what existing tools already test and any remaining downstream application compatibility gaps.

- A reproducible proof of concept demonstrating that the proposed checks can detect a meaningful compatibility issue or regression.

- Evidence from developer conversations and written pilot commitments from at least two active Rootstock projects.

We will not assume in advance that the gap exists. If the audit and developer feedback do not establish a meaningful, distinct need, or if the required pilot commitments are not secured, we will pause after Milestone 1 and submit the findings rather than automatically proceed to Milestone 2.

**4. Milestone 2 and Milestone 3 requirements**

Progression to Milestone 2 will depend on meeting the Milestone 1 criteria: a demonstrated gap not adequately covered by existing tools, a reproducible proof of concept, and written commitments from at least two active Rootstock projects to evaluate RPCDrift.

Milestone 3 will require **three completed and evidenced pilot integrations**. Each pilot must demonstrate RPCDrift being used in a real development or testing workflow, with evidence of the checks executed, results produced, and feedback collected. A demonstration or expression of interest alone will not count as a completed pilot.

**5. Scope and maintenance**

RPCDrift will remain focused on downstream application-facing RPC compatibility and regression testing, including a practical workflow that developers can run against their Rootstock endpoints and integrate into CI where appropriate. The initial set of checks will be determined by the source audit and feedback from prospective users, rather than by assuming existing Rootstock infrastructure is inadequate.

We will also keep post-release maintenance bounded to 12 months following the stable release, covering reasonable bug fixes and compatibility updates within the project’s capacity. This will not imply a 24/7 support commitment or an unrestricted maintenance obligation.

Best regards,  
The RPCDrift Team

---

<div class="post-metadata">

**Author:** ![DAOstar\_gov](https://yyz2.discourse-cdn.com/flex030/user_avatar/gov.rootstockcollective.xyz/daostar_gov/32/593_2.png) [@DAOstar\_gov](https://gov.rootstockcollective.xyz/u/DAOstar_gov)\
**Post date:** [October 29, 2026, 11:15pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/8 "2026-10-29T23:15:11Z")

</div>

Thank you @Carl and the team for the detailed proposal, and for engaging with the feedback so far.

I’d like to echo @Seviramar and @Mattsanto ’s comments about documented demand for this solution. The revision in the last post go in the right direction: to reach out to five active Rootstock teams, aiming for at least three substantive conversations, and securing written interest from at least two projects. However, those commitments are still listed as part of Milestone 1, so demand would be established after funding rather than before.

I’d ask the team to refer to the [Grants Guidelines V3.3](https://gov.rootstockcollective.xyz/t/general-guidelines-for-grant-applications/94/29), published and enforced since September 3, 2026:

> **1. Demand Validation is now a hard gate (Section 3.1, Step 2)**  
> Off-chain proposals must now include a Demand Validation section before a project can proceed to the Initial AMA. Evidence required depends on sector:
> 
> - Dev tooling / infrastructure: at least one named integrator LOI, or documented interest from a top Rootstock dApp
> 
> […] Proposals without this evidence will not proceed.

My reading is that this evidence should be part of the off-chain proposal before it moves to the Initial AMA, and therefore before the on-chain vote and M1 funding. Is it feasible for the team to have an LOI or documented interest before M1?

Looking forward to your comments.

---

<div class="post-metadata">

**Author:** ![Axia](https://yyz2.discourse-cdn.com/flex030/user_avatar/gov.rootstockcollective.xyz/axia/32/576_2.png) [@Axia](https://gov.rootstockcollective.xyz/u/Axia)\
**Post date:** [October 30, 2026, 6:01pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/9 "2026-10-30T18:01:05Z")

</div>

@Carl Thanks for the clarifications. I now understands the intended distinction: Rootstock’s existing integration tests assess core network behavior, while RPCDrift would help downstream applications detect whether an RPC-response change could break their own parsers, SDKs, indexers, or CI workflows. That can be useful tooling.

The remaining issue is validation. The current Milestone 1 would fund the team to determine whether a distinct gap exists and whether Rootstock developers need the tool. Under the current grant guidelines, developer tooling should show named ecosystem demand before proceeding—not use the first tranche to discover it.

Before this moves forward, I would like to see one named Rootstock integrator or documented expression of interest, along with one concrete compatibility scenario that existing Rootstock testing does not already cover. That would turn the proposal from a plausible tool concept into a targeted solution to an evidenced developer problem.

---

<div class="post-metadata">

**Author:** ![iamChekwube](https://yyz2.discourse-cdn.com/flex030/user_avatar/gov.rootstockcollective.xyz/iamchekwube/32/279_2.png) [@iamChekwube](https://gov.rootstockcollective.xyz/u/iamChekwube)\
**Post date:** [October 31, 2026, 6:38am UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/11 "2026-10-31T06:38:20Z")

</div>

RPCDrift asks for $8,500 over three milestones to build an open-source TypeScript CLI and GitHub Actions workflow. Rootstock dapps, wallets, explorers and indexers would use it to catch JSON-RPC compatibility regressions before they reach production. The first test profile focuses on receipt and transaction behavior tied to the proposed Cardamom upgrade. Only Milestone 1 ($2,125) would be requested on-chain at first.

**Assessment**

_Pros_

- The problem is real. Downstream breakage after network upgrades is costly, and today most teams catch it with ad hoc scripts.
- The scope is honest and well bounded. It defaults to read-only on mainnet, marks Cardamom tests as provisional, and says plainly what the tool will not claim (consensus correctness, security guarantees).
- The milestone-gated funding and the commitment to usage metrics instead of TVL or wallet numbers are good practice.
- The technical lead’s background in static analysis and testing tooling fits the work well.

_Cons_

- Some KPIs are soft. “Targeted,” “sought” and “where supported” make it hard for reviewers to judge whether a milestone was actually met.
- The overlap with Rootstock’s integration-test repo is acknowledged, but it won’t be resolved until after Milestone 1 is funded.
- Zynnor has no listed role, and there is no plan for who maintains the test profiles after week 9.
- A few lines read like internal drafting notes, for example “so we should not describe it as a merged contribution,” “confirmed with RootstockCollective before submission,” and the note about link limits. They make the proposal feel unfinished.

**Suggestions for Improvement**

1. Turn the targets into firm acceptance criteria. For example: “5 interviews completed and summarized” and “2 named pilot teams with signed-off intent.”
2. Name the likely pilot partners now (wallets, explorers, indexers), even if they are only tentative.
3. Add a go/no-go point at the end of Milestone 1. If the duplication analysis shows major overlap, the scope narrows and the M2 budget is revised.
4. List 5 to 10 example test cases (specific methods and fields) so reviewers can judge depth. Explain how baseline comparison will handle nondeterministic fields like block numbers and timestamps.
5. Say whether you will reuse or align with existing formats such as Ethereum’s execution-apis RPC tests, instead of building from scratch.
6. State the license, define Zynnor’s role, and add a short post-grant maintenance commitment, for example updating profiles for the next two upgrades.
7. Verify team identities publicly, for instance with a confirming comment or commit from each listed GitHub account.

Overall, this is a useful and well-scoped tooling proposal. Tighter KPIs and named pilots would make it much easier to support.

---

<div class="post-metadata">

**Author:** ![ChronoTrigger](https://yyz2.discourse-cdn.com/flex030/user_avatar/gov.rootstockcollective.xyz/chronotrigger/32/78_2.png) [@ChronoTrigger](https://gov.rootstockcollective.xyz/u/ChronoTrigger)\
**Post date:** [October 31, 2026, 2:36pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/12 "2026-10-31T14:36:23Z")

</div>

Thanks @Carl. I agree with @DAOstar_gov and @Axia that under V3.3 the demand evidence needs to be in the proposal before the AMA, so I won’t repeat that further. I’ll just say we’ve had other good proposals based in dev infrastructure and the experience showed that demand validation was really the right focus.

One thing I’d like you to ellaborate is on team verification:

The technical lead is listed as Kitsune, linked to [0xKitsune · GitHub](http://github.com/0xKitsune), and most of the proposal’s technical credibility rests on that profile. Could Kitsune confirm involvement directly, e.g.: a comment here or a post from the linked GitHub or X account? Same for Zynnor. If someone else will be doing the technical work, please update the proposal with who that is.

Small accuracy point: the reply to Matt mentions “the two Kenyan startups mentioned in our proposal,” but the proposal doesn’t mention any, and the earlier reply referred to one preliminary conversation with a Kenyan startup. Since demand is the open question, it’s worth keeping those claims precise.

---

<div class="post-metadata">

**Author:** ![Eren\_DAOplomats](https://yyz2.discourse-cdn.com/flex030/user_avatar/gov.rootstockcollective.xyz/eren_daoplomats/32/487_2.png) [@Eren\_DAOplomats](https://gov.rootstockcollective.xyz/u/Eren_DAOplomats)\
**Post date:** [October 31, 2026, 6:34pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/13 "2026-10-31T18:34:09Z")

</div>

Thanks for adjusting the ceiling to $6,750, @Carl .

Just weighing in to echo @DAOstar_gov and @Axia : verified demand evidence must precede the Initial AMA, rather than serving as the funded deliverable for M1. To clear up any administrative confusion before this moves forward, could you edit the original proposal post to reflect the revised tranches and clearly map out the pre-funding requirements?

---

<div class="post-metadata">

**Author:** ![SEEDGov](https://yyz2.discourse-cdn.com/flex030/user_avatar/gov.rootstockcollective.xyz/seedgov/32/673_2.png) [@SEEDGov](https://gov.rootstockcollective.xyz/u/SEEDGov)\
**Post date:** [November 2, 2026, 5:55pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/14 "2026-11-02T17:55:28Z")

</div>

Hi Carl, thanks for this proposal!

> [@Carl](#):
>
> Final targets will be adjusted to reflect validated demand, pilot access, and the technical capabilities confirmed during Milestone 1.

We don’t have much to add to what @DAOstar_gov [said before](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/8).

Just to clarify, this is not a whim or an excessive request on the part of the delegates, but rather a [mandatory requirement of the Grant Guidelines](https://gov.rootstockcollective.xyz/t/general-guidelines-for-grant-applications/94/29#p-3829-new-requirements-2) to which we must all comply. In our role as delegates, it is our responsibility to ensure that proposals comply with these guidelines.

Consequently, we recommend that, prior to the AMA and any vote, you obtain proof of the demand validation and submit it so that we can verify it, and adapt the proposal accordingly to reflect this.

Thanks!

---

<div class="post-metadata">

**Author:** ![Manuvegadt](https://avatars.discourse-cdn.com/v4/letter/m/258eb7/32.png) [@Manuvegadt](https://gov.rootstockcollective.xyz/u/Manuvegadt)\
**Post date:** [November 3, 2026, 12:49pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/15 "2026-11-03T12:49:57Z")

</div>

Hi @Carl, thanks for taking the feedback on board so quickly and lowering the ask. Previous comments already cover the demand proof the guidelines ask for before the AMA, plus the team and maintenance questions, so I’ll leave those to you and add a few things from the user side. I’m not a developer, and that’s how I read this.

I like that RPCDrift never asks for private keys and doesn’t touch funds. Saying that in one clear line at the very top of the README would help, because any new tool near wallets makes everyday users nervous.

A few ideas:

1. When a check fails, could the report include a short summary in plain words next to the technical detail? Many people who use Rootstock apps every day aren’t developers, and a clear summary would help them understand what changed.
2. Could the reports for each network upgrade live in one public place? People could check whether the wallet or explorer they use every day was tested before a change like Cardamom, and that builds confidence.
3. The M1 plan already includes a recorded demo. Could it be public, and explained so non technical people can follow it too? Ambassadors could share it so more Rootstock builders hear about the tool.

Tools like this rarely get attention outside developer circles, but they protect the apps regular users rely on, so making the results easy to read matters. Looking forward to following this one.

---

<div class="post-metadata">

**Author:** ![LEGOSI](https://yyz2.discourse-cdn.com/flex030/user_avatar/gov.rootstockcollective.xyz/legosi/32/23_2.png) [@LEGOSI](https://gov.rootstockcollective.xyz/u/LEGOSI)\
**Post date:** [November 5, 2026, 10:30pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/16 "2026-11-05T22:30:36Z")

</div>

¡Hola, Carl y equipo! Es excelente ver reflejados en el post principal los cambios del presupuesto a $6,750 y el blindaje de hitos, respondiendo al análisis de Matt. El desafío ahora es puramente administrativo bajo las reglas V3.3: para avanzar a votación, el paso clave es sumar la validación previa de demanda aportando una Carta de Intención (LOI) de dApps aliadas y verificar públicamente los GitHubs de los desarrolladores en este hilo.

Sumando valor a lo propuesto por Manuvegadt, sugerimos destacar explícitamente en el README que la CLI no manipula claves privadas ni fondos para dar tranquilidad al usuario. Además, incluir resúmenes simplificados y un repositorio público para los reportes de regresión permitirá que la comunidad no técnica comprenda el impacto visual de cada actualización de red (como Cardamom).

---

<div class="post-metadata">

**Author:** ![emmarobinson](https://avatars.discourse-cdn.com/v4/letter/e/e36b37/32.png) [@emmarobinson](https://gov.rootstockcollective.xyz/u/emmarobinson)\
**Post date:** [November 18, 2026, 9:00pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/17 "2026-11-18T21:00:02Z")

</div>

On the testing design: receipt and transaction RPC responses depend on chain state, so comparing live mainnet runs can produce false positives. It may be worth making M1 explicit that regression checks run against pinned block heights or captured fixtures, with a separate lightweight smoke test on live networks. That keeps the compatibility signal about RPC behavior rather than changing state, and gives teams a stable baseline for CI.

---

<div class="post-metadata">

**Author:** ![IBUKI](https://yyz2.discourse-cdn.com/flex030/user_avatar/gov.rootstockcollective.xyz/ibuki/32/948_2.png) [@IBUKI](https://gov.rootstockcollective.xyz/u/IBUKI)\
**Post date:** [November 19, 2026, 3:59pm UTC](https://gov.rootstockcollective.xyz/t/rpcdrift-rootstock-rpc-compatibility-regression-testing/1011/18 "2026-11-19T15:59:28Z")

</div>

Hi @Carl, I’m building Rootstock BlockBeat, a community tool that visualizes recent Rootstock blocks and explains transaction details in Japanese. Users can view transaction status, gas used, and confirmations without connecting a wallet.

> **[Rootstock BlockBeat](https://rootstock-blockbeat.pages.dev/)**
>
> A live Rootstock block visualizer and Japanese transaction lens by a Rootstock Ambassador.

Your proposal caught my attention because I want to understand how a small tool like mine could check that its data retrieval and interpretation still work correctly after a network upgrade. Reusable compatibility checks seem useful, especially for smaller projects that do not have a dedicated testing team.

My main concern is how easy it would be to get started and act on the results. Could a developer select only the checks relevant to their application, such as block queries and transaction receipts, with minimal configuration?

When a check fails, could the report show the expected and actual response, explain which difference matters, and suggest what to inspect next?

A minimal example for a block visualizer or transaction lookup tool, showing setup, a detected issue, and a successful recheck, would help me assess whether RPCDrift fits BlockBeat. What would you need to know about my current setup to determine compatibility?
